The Mini-8 is flexible and able to achieve maximum grinding efficiency in short sections. Its flexible configuration allows it to grind different rail profiles. It can grind all sections of rail, including switches, and can be mounted with a measuring trolley.
Advantages of the Mini-8
The Mini-8 can operate in multiple different environments, such as conventional railways, heavy-haul railroads, high speed lines, regional lines, underground railways, tramways, open tracks, tunnels, switches, and level crossings.

Not only can it remove minor and medium rail defects such as wheel burns, but it can also prevent defects from forming. The Mini-8 travels up to 80 km/h, which allows it to be anywhere at any time to fix defects without having to close tracks down or prepare tracks in advance. After grinding, rails can be used immediately for normal railway operations.

When the rail surface starts to form corrugations, more noise is generated, which could lead to a high-pitched squealing noise for passengers. To prevent the rail surface from becoming rough, the Mini-8 helps grind the track to become smooth again, which lowers the noise level and removes vibration, resulting in quieter rail.
Technical Information
Track Gauge:
 
According to specifications
Overall length:
 
14m
Overall width:
 
2.62m
Overall height:
 
3.65m
Max axle load:
 
12t
Weight:

Empty

In operation

37.5t

40t

Speed:

Grinding

Travelling

3-6km/h

Up to 80km/h

Min curve radius:

Grinding

Travelling

150m

80m

Max gradient:
 
45%
Noise level:
At 25m
75dB(A)
Fuel tank capacity:
 
800L
Water tank capacity:
 
Up to 3000L
Engine power:
 
242kW

Indicative information only, each vehicle SPENO manufactures is customised according to customer requirements and specifications.